The building was already specified as a structural steel frame and brick façade. However, an aggressive construction schedule was to begin during the winter which can often lead to delays. The owner was open to the assurances and savings precast can provide, but would not compromise on the desired architectural impact.

Performance

  • Precast erected in 44 days
  • No accidents or incidents
  • On time and within budget

Project Details

  • Four level structure
  • 461 pieces of concrete
  • 75,000 sq. ft. of precast double tees
  • 23,500 sq. ft. of brick-faced precast panels
  • Designed to MNL-117 standards
  • Architectural/structural precast wall panels
  • Double tee floor and roof system
  • Precast stair/elevator towers

Architectural Finishes

  • Thin brick
  • Limestone-like finish
  • Exposed aggregate
  • Sandblasting
  • Reveals
  • Buff colored concrete mix design with local aggregates

Testimonial

“Truthfully, we were both skeptical and reluctant to change to a total precast structure including the architectural brick façade. However, the cost savings Metromont offered coupled with assurances of quality, safety and schedule were convincing enough for us to take the gamble. The end result has been outstanding and a project which we are all proud of!”
- Mac Carpenter, BE&K Building Group