ODU Foreman Field Complex Parking Garage
Parking Structure I Norfolk, Virginia
THE HEROES
Architect: Clark Nexsen Architecture & Engineering – Norfolk,VA
Contractor: S. B. Ballard Construction Company – Virginia Beach, VA
THE CALL
Old Dominion University announced they would bring football back after a 60-year absence. They needed a 724-space parking garage whose facade could match the newly-constructed luxury suites as well as the 70+ year-old stadium.
PERFORMANCE
Through the use of thin brick, buff-colored concrete and sandblasting, Metromont was able to assist in creating a look that blends old with new with minimal site disturbance on campus. And, the project was completed six-months prior to the scheduled completion date.
PROJECT DETAILS
- 216,361 sq. ft., five-levels
- 724 parking spaces
- Direct access to Game Day Building
- The parking structure houses a storage area for the Game Day Building, playing field equipment and a ticket sales area for stadium events
ARCHITECTURAL FINISHES
- Pigmented concrete mix design
- Reveals and Sandblasting
- Thin brick
SUSTAINABILITY HIGHLIGHTS
- Use of local and regional materials
- Manufacturing offsite allowed for a reduction in laydown area and minimized site noise
- Ability to work within the building footprint area resulted in less disturbance to the site
- Use of thin brick reduced the amount of harvested materials.