Father Ryan Athletic Complex

High School Athletic Complex | Nashville, TN

The Heroes

Architect: Gresham Smith & Partners
Contractor: Hardaway Construction Corporation

The Call

In its 80 year history, Father Ryan High School in Nashville never had a home stadium and as such, never hosted a home game. Thanks to an alumnus grant, they could finally have a home stadium if it could be constructed within budget.

Performance

By utilizing existing forms for stadium risers, Metromont was able to provide the school with a superior product in a condensed time frame and at a substantial cost savings. The 2,376-seat stadium was delivered on time and within budget.

Quote

“Metromont was very helpful throughout the design portion of this project as well as through construction. We had a very tight schedule that they helped us meet. As it turned out, the precast solution was more economical than an all-aluminum stadium and we got the job completed on time.”
-Jim Edwards, Senior Project Manager, Hardaway Construction Corp

Project Details

  • A new football stadium with press box along the top
  • 2,376-seat stadium
  • Storage space below structure
  • Stadium risers supported by precast columns, short wall panels and raker beams
  • Complete erection of structure in eight days

Architectural Finishes

  • Standard gray finish with dovetails for attachment of field laid brick veneer
  • Stadium treads received a light broom finish

Sustainability Highlights

  • Use of local and regional materials
  • Use of recycled content
  • Manufacturing offsite allowed for a reduction in laydown area and minimized site noise
  • Ability to work within the building footprint area resulted in less disturbance to the site