Atlanta Falcons Stadium (Mercedes-Benz Stadium)

Atlanta, GA
ARCHITECT:
360 Architecture
CONTRACTOR:
Holder/Hunt/Russell/Moody, a Joint Venture
Metromont Project Details

Project Overview

Opened in August 2017 as a replacement for the Georgia Dome, Mercedes-Benz Stadium serves as the home stadium for the Atlanta Falcons. With features such as a retractable roof and flexible seating that can be adjusted to 75,000 or up to 83,000 depending upon events, the 2.1 million SF Mercedes-Benz Stadium is a steek structure with prestressed concrete stadia seating sections. The stadium is LEED platinum certified and includes sustainable features such as high-efficiency water fixtures that reduce sanitary water consumption by 40%. LED lighting also serves to reduce the stadium’s energy maintenance costs. Metromont’s Hiram, GA manufacturing facility produced approximately 380,000 SF of precast concrete stadia seat sections for the project (approximately 2,600 pieces).

Project Details

Retractable roof
Flexible seating adjusted to 75,000 or up to 83,000
LEED platinum certified
High-efficiency water fixtures reducing sanitary water consumption by 40%
380,000 SF of precast concrete (approximately 2,600 pieces)

Do you have a similar project?

We’d love to hear more about it and answer any questions you have.

"Thank you for your professionalism and expertise on the Cornell University North Campus Residential Expansion. Your contributions were critical to our success."
Ben Robertson
Welliver
"Metromont was an excellent partner and worked seamlessly, closely to collaborate almost as an extension of our design team. It’s incredible how quickly it all came together.”
Scott Johnston
AIA Johnston Design Group
"The precast concrete design was able to meet the stringent performance requirements of the structure while providing an aesthetically pleasing, sustainable final product at an affordable price point."
Ben Townes
Townes + Architects
"Metromont’s team embraced our idea and got their whole team on board. It’s one thing for sales managers to want to make architects happy, but to have the plant manager, the finishing crew foreman and engineers fully engaged is something else. Metromont was extremely cooperative – the project was a win-win for everyone.”
K.J. Jacobs, AIA
McMillan Pazdan Smith

Let's Discuss Your Project

Our industry-leading experts are ready to answer your questions and put our proven experience to work for you. Contact us today and let’s discuss the ins and outs of your project.

Name(Required)
This field is for validation purposes and should be left unchanged.
Metromont Concrete Slab

Camden Yards Ballpark

Baltimore, MD

Lawrenceville Performing Arts Center

Lawrenceville, GA

South Carolina Children’s Theatre

Greenville, SC

Truist Park

Atlanta, GA

Marlins Stadium

Miami, FL

Busch Stadium

St. Louis, MO

Cobb Energy Centre for the Performing Arts

Atlanta, GA

Orlando Citrus Bowl

Orlando, FL