Metromont Logo

LUNA at Viera

Viera, FL
ARCHITECT:
DAG Architects, Inc.
CONTRACTOR:
North American Properties
Metromont Project Details

Project Overview

LUNA at Viera is a six-story upscale apartment community in Viera, Florida, surrounded by some of the city’s most prominent buildings. The total precast concrete design utilizes Metromont’s proprietary MetroDeck flooring system and is comprised of 256,158 SF of precast concrete produced at Metromont’s Bartow, FL, manufacturing facility. The project also includes a 101,704 SF parking deck with four elevated levels of precast concrete. The exterior façade of the structures features a formliner and heavy, medium, and light sandblast finishes. The new Luna community includes 245 units, a business lounge, a green screen for film and podcasts, a rooftop wine lounge, a dog wash, and a mailroom with an Amazon hub. The six-story total precast complex is unique for the Viera area, where most apartment communities are two- to three-story garden apartments.

Project Details

6-story total precast structure
245,158 SF of precast concrete for the multifamily structure
4 elevated levels, 101,704 SF precast parking deck
MetroDeck flooring system

Architectural Details & Finishes

Formliner
Heavy, medium, and light sandblast finishes

Do you have a similar project?

We’d love to hear more about it and answer any questions you have.

"Thank you for your professionalism and expertise on the Cornell University North Campus Residential Expansion. Your contributions were critical to our success."
Ben Robertson
Welliver
"Metromont was an excellent partner and worked seamlessly, closely to collaborate almost as an extension of our design team. It’s incredible how quickly it all came together.”
Scott Johnston
AIA Johnston Design Group
"The precast concrete design was able to meet the stringent performance requirements of the structure while providing an aesthetically pleasing, sustainable final product at an affordable price point."
Ben Townes
Townes + Architects
"Metromont’s team embraced our idea and got their whole team on board. It’s one thing for sales managers to want to make architects happy, but to have the plant manager, the finishing crew foreman and engineers fully engaged is something else. Metromont was extremely cooperative – the project was a win-win for everyone.”
K.J. Jacobs, AIA
McMillan Pazdan Smith

Let's Discuss Your Project

Our industry-leading experts are ready to answer your questions and put our proven experience to work for you. Contact us today and let’s discuss the ins and outs of your project.

Name(Required)
This field is for validation purposes and should be left unchanged.
Metromont Concrete Slab

The Shepherd Hotel

Clemson, SC

The Standard at New Brunswick

New Brunswick, NJ

The Barclay at SouthPark Retirement Community

Charlotte, NC

JW Marriott

Charlotte, NC

The Standard at State College

State College, PA

The Metropolitan

State College, PA

Clemson University Douthit Hills Student Housing

Clemson, SC

Cornell University Student Housing

Ithaca, NY

French Broad Place

Brevard, NC

GSU Piedmont Central Student Dormitories

Atlanta, GA

GSU University Commons

Atlanta, GA

Levern Hamlin Allen Residence Hall at WCU

Cullowhee, NC

Locks Tower

Richmond, VA

NOVA Southeastern University MAKO Residence Hall

Davie, FL

Proximity Hotel

Greensboro, NC

River Pier Landing

Chattanooga, TN

SCAD Montgomery House

Savannah, GA

South Falls Tower

Richmond, VA

The Bookends

Greenville, SC

The Cascades

Tallahassee, FL

The FORTY Residence Hall & Event Space at SCAD Atlanta

Atlanta, GA

The Hawk

Charlotte, NC

The Pearl

Tampa, FL

The Standard at Atlanta

Atlanta, GA

The Tides Luxury Condominiums

Mount Pleasant, SC

University of South Florida Student Housing & Dining Hall

St. Petersburg, FL